Plumbing Invoice Template — PDF, Word & Excel
Invoice plumbing repairs, labour and replacement parts.
Your current input stays until you confirm a replacement.

Download an offline template
Blank business details, editable work items and no example prices. One offline layout, separate from the online Simple, Modern and Branded styles.
PDF is for printing, without fillable fields. Word tables are editable; neither format calculates totals. Excel: eight lines, CAD only. Quantities: 0–10,000, up to three decimals. Rates: 0–10,000, up to two decimals. Each line rounds half up to cents. No tax, discounts, shipping, deposits or payment balance calculations. Review inputs and totals.
Choose “Use this template” to edit online and export a completed PDF. Offline downloads leave your browser draft untouched.
A practical example
Fictional example. Replace the details and rates before use. CAD rates are illustrations, not price recommendations.
| Description | Quantity | Unit | Rate (CAD) |
|---|---|---|---|
| Tap replacement labour — fictional property | 2 | hour | 90 |
| Replacement tap — sample part | 1 | item | 75 |
What to fill in
- Include the job reference and date of service.
- Clarify call-out charges and materials; this invoice is not an inspection certificate.
Identify the fixture and the work performed
Name the fixture or affected area, such as the kitchen tap or upstairs drain, and distinguish an investigation from a completed repair. For a landlord or manager, connect it to the relevant property work order.
Explain a repair that needed a return visit
If diagnosis and installation happened on different dates, identify what was done on each visit and what the agreed charge includes. List separately supplied parts by useful description, and avoid billing another call-out where the agreed repair package already covers the return.
Plumbing invoice questions
Can I bill drain clearing as a fixed job?
Yes. Describe the drain or area serviced, use a job unit with quantity one and enter the agreed fee. Add parts or extra time only when outside that job price.
How do I bill an emergency visit?
Add an agreed call-out charge as a separate line and explain whether any initial labour is included.
Does this certify the installation?
No. Inspection certificates, permits and warranty approvals require their own documents.